Latest release version5.1.x cumulative update, including changes for 4.1.0 – 5.1.5 22 changes Improved Windows x64 and .NET 8 Tamara has migrated to the Windows x64 platform and .NET 8. The old version ran on the Windows x86 platform, which limited the client machine's RAM usage to a maximum of 4 GB. The new version removes this restriction, which makes modelling big projects more stable. New Oracle Primavera custom fields Custom fields from Oracle Primavera projects can be imported into the main interface.Imported custom fields can be displayed in the Tamara project's main view, with filtering and search by these fields.Imported custom fields can be displayed in the results trees for all charts, with search and filtering. New Results and charts Chart data can now be exported to the clipboard / Excel format.Task filtering by "All / Only Milestones" in the result view interfaces.Updated visual design for the "Trend" chart type.A "Correlation Chart" mode without trend line rendering.Markers can now be added to result charts. New Interface and scenarios Import Audit window and audit report redesign.Scenario support extended to Productivity Risk Factors.User interface redesign to improve usability.A new project-level settings interface with streamlined access to the simulation scenario editor. Improved Changes to existing functionality Automatic simulation replaced with manual triggering via a button.Data transfer between Tamara and Pelican now supports transferring simulation data (statistics, key percentiles) for multiple Tamara project milestones assigned to the Pelican entity.Spreadsheet performance improved.Localisation improvements. Fixed Graphical issues with dependency rendering and critical path display in the Gantt chart.Output spreadsheet charting: missing charts after changing the number of simulation inputs / outputs.Task scheduling: lag calculation when the predecessor and successor had different calendars assigned.A sporadic issue with project update for projects with multiple scenarios enabled.Minor bug fixes.
version4.1.x cumulative update, including changes for 3.0.7 – 4.0.9 27 changes New Customisable acceptance criteria in the Import Audit report Target values for each project file QA requirement can now be adjusted to your needs. New Filtering in the project main view Tasks can be filtered by each column. The top row can then be used to assign risks, categories, uncertainties and so on to the filtered tasks only. New Categories for task-specific risks Users can create their own list of categories and assign them to risks, which simplifies navigation and filtering. Categories can also be used when presenting simulation results with the Tornado chart.A new task-specific risks selector for the project main view, with detailed information about each risk (category, name, impacts).A new "Categorised" Tornado chart mode: task-specific risks on a Tornado chart can be aggregated over risk categories. New Simulation results charts Zoom: enlarge the range of interest on a chart or zoom out to see the full picture.Improved visualisation of simulation data with animated transitions for output graphs.Automatic checks for software updates can be enabled or disabled. Improved Spreadsheet functionality Data table updating performance and reliability significantly improved.Simulation stability improved.Fixed the progress bar during simulation.Fixed unstable spreadsheet simulation caused by changing the number of samples.Fixed the same simulation results being displayed for different risk scenarios assigned in the spreadsheet.Minor fixes and improvements. Improved Main application: behaviour changes Task-specific risks with zero frequency / impact are excluded from the simulation.Two types of constraints (START_ON, FINISH_ON) added to the Schedule Audit interface during project import.A classic Tornado chart (without alignment at zero) shows the minimum and maximum dates (start / finish mode) or values (duration / cost mode).The Primavera P6 file version restriction during project import has been removed, so all required fields can be imported from projects saved in old formats. If the import fails, a warning is shown and the import continues with the WBS structure only.UI improvements for high DPI mode. Fixed Main application Incorrect risks / uncertainties / categories assignment to the filtered set of tasks.Copying simulation statistics in date format.Scatter result chart appearance (labels overlapping, excessive date labels).Parameter validation in the task-specific window: the frequency editor gave false-positive validation errors when switching from single-event to multiple-event risks.An unexpected 100x increase in custom uncertainty distribution parameters on localised versions of the application.Minor fixes and improvements. Fixed Report Designer The schedule line and user markers were not shown on charts showing durations.An error was shown when trying to load a newly created report template.
version3.0.6 4 changes New A new critical path simulation report output (critical / longest).A new file import audit report. Improved DevExpress library upgraded to 22.1.4.Minor improvements and bug fixes.
version3.0.5 2 changes New Integration with Pelican A new option to integrate Tamara with Pelican software: SID files can be used in the simulation of task-specific risks. Improved Minor improvements and bug fixes.
version3.0.3 4 changes New A completely new Gantt chart view A new Gantt chart view of the project structure. Improved Improved reliability for XER files created with old versions of Primavera.Documentation updated.Minor improvements and bug fixes.
version3 4 changes New Spreadsheet feature An integrated table that gives a more Excel-like way to describe the uncertainty around task durations and costs. Improved DevExpress library upgraded to 21.2.6.Documentation updated.Minor improvements and bug fixes.